Pouring Concrete at Mt. White Station in Freezing Conditions
The new 38m Sermac pump in action at Mt White station pouring 58m3 in freezing conditions. This was a joint effort from Firth Darfield which contributed 37m3 and Greymouth plants contributed 21m3 – a great effort from everyone involved.