University of Canterbury Structural Engineering Laboratory
3 pumps, 2x37m + 1x27m, 1000m3 base slab pour with three layers of different concrete strengths, then three large 890mm thick wall pours with “tremie’s” in two layers.
View gallery »
3 pumps, 2x37m + 1x27m, 1000m3 base slab pour with three layers of different concrete strengths, then three large 890mm thick wall pours with “tremie’s” in two layers.
View gallery »
4 pumps, 2x37m + 2x27m, nine large raft slabs including 2232m3 (NZ Record) over 11 hours. 11000m3 poured in total including Base Columns.
View gallery »
3 pumps, 2x37m + 1x27m, six large raft base slabs then 8 storey buildings on top of that, completion 2017
View gallery »
2 pumps 2x37m + spare pump onsite, Four large base pours then 7 storey building on top of that, completion 2017.
View gallery »
3 pumps, 2x37m + 1x27m, First of large developments in 2014, 7 large raft base pours over 2 months, then 3 buildings on top of that, completion 2017.